Set up the Coir Matting within the trench. Put no less than 12 inches on the roll over the trench (more up the slope). Place Each individual staple a few foot apart Within the trench Positioning: Position the coir logs within the waterline or alongside the edge from the eroded https://holdendshja.bloggosite.com/40867762/the-coir-matting-diaries