The main park includes a capacity of two hundred MW whilst Sandrini II incorporates a ability of one hundred MW. The overall price of both tasks weren't disclosed however, during construction, more than 200 workers had been utilized. The assignments are predicted to view A few positions opening up for https://californiasolarpanels.movie.blog/2024/11/26/4-things-to-consider-before-hiring-commercial-solar-installers/