The startup and commissioning (testing) procedure is finished following the program is totally installed and able to operate. The system is turned on and will have to run for fifteen-20 minutes. This will allow the refrigerant to move through the process and begin the air conditioning course of action. Thermostat: https://socialbaskets.com/story4309750/about-air-conditioning-installation